Interested in pioneering your future?

Delta 01 Access Road

Client Federal Highway Administration
Date September 2023 – November 2023

This project featured the complete reconstruction of a half-mile roadway providing access to one of the Minuteman Missile Silo Museums. Work included grading, drainage improvements with approximately 400 linear feet of reinforced concrete pipe (RCP), placement of 3,000 tons of base course, and paving 1,800 tons of asphalt. The improvements not only enhanced the safety and drivability of the road but also provided a smoother and more reliable route for visitors traveling to this historic site.

Related Projects

Deadwood Hill Before

Deadwood Hill Parking Lot

This project transformed a previously vacant lot into a fully developed, functional, and visually appealing parking area. The work included hauling more than 27,000 cubic

Read More
STM After

Saint Thomas More Track

This project involved converting the school’s existing gravel track into a durable asphalt surface. The scope of work included preliminary grading and widening, gravel preparation,

Read More
×
×